The stairwell project moves along. I have the wiring all re-installed and functioning. The framing is done and I used a scrounged window sash and made a frame for it and hinged the sash so it will open into the stair way for basement. I have to put up a little more drywall and will do pine tongue and groove on 2 lower faces of the "fake steps" that mimic the stairway they hide. The lower horizontal surface will be set up as a seat I think and the 2 upper ones will be shelves.
No comments:
Post a Comment