 |
| new concrete ready for framing in opening |
The opening to the concrete floored crawlspace/storage area below the rear closed in porch room was repaired with a new post and a patch spliced to the old corner post as well as the new concrete curb to keep the sill off the ground. It is framed up waiting for some sheathing/siding and a door for access.
 |
framed in and ready for sheathing and door/hatch
|

New blue stripe tires for the 1983 Schwinn and a new cargo rack on rear as well.
No comments:
Post a Comment