 |
| @ 781-checking gas line ability to hold pressure |
What have I been doing-I put in the lower rail for the ongoing fence project. The upper rail was waiting till I new the height of my pickets from Columbia. I had to go to Columbia to work on the gas line and hook up the gas water heater after disconnecting the small electric one. I seem to have forgotten the cord for the camera so pictures will have to come later. I did bring home 160 used cedar pickets for the fence.
 |
| lower fence rail- and the deck blocks for shed foundation |
No comments:
Post a Comment