Wednesday, December 11, 2013

plumbing under the bathroom sink...and RED DOG
The bathroom sink bowl is in the top now and faucet and water supply and waste /vent lines all hooked up. I will do more mosaic work - on the walls around sink and to the front vertical portion.


basement stairway light

I installed a light in the basement stairway( a gifted dumpster find)-operated by the same light switch that turns on the basement lights, so now I can easily see if the lights are left on.

Speaking of dumpster finds-I've been collecting granite pieces from a dumpster not far from me. I am mostly collecting for the future kitchen build. I've built 2 kitchens using dumpstered granite/mosaic for the counter tops and they turn out very nice.


No comments:

Post a Comment