Friday, November 28, 2014

the old cut out- resting on floor
I thought I was done posting here- but here I go again. The stack in the basement finally moved close enough to the top of the list that I chose it. I had to manage 6 different fittings in less than 4' of space. I now have a drain plumbed for the washing machine and the laundry sink as well.
the new- almost done
The neighbors leaves in me yard- a tulip poplar I think.





The chimney also worked it's way to the top of the list. Tuck pointing was needed on all sides. Ignore the smudges, it cleaned up well afterwards.

No comments:

Post a Comment