 |
| wiring below the new bead board shelf unit |
Thinking I may get to the mosaic/tile back splash this winter- I figured I needed to do the last of the electric updating. More receptacles are going in over counter and maybe another switched circuit for under cabinet puck lights. Strange diagonal bracing in wall required more plaster excavation than generally required.
No comments:
Post a Comment